HUAWEI BTS3900L PDF

Indoor model: BTS, BTSL. − Outdoor model: BTSA. ○ Distributed base station: DBS BTS BTS, the indoor macro base station. Huawei series LTE FDD base stations can be classified into indoor macro base stations (BTS and BTSL), outdoor macro base stations. Manuals and User Guides for Huawei BTSL GSM. We have 1 Huawei BTSL GSM manual available for free PDF download: Installation Manual.

Author: Gosar Faubei
Country: Burma
Language: English (Spanish)
Genre: Environment
Published (Last): 27 July 2005
Pages: 484
PDF File Size: 16.52 Mb
ePub File Size: 14.20 Mb
ISBN: 588-7-59753-835-8
Downloads: 19242
Price: Free* [*Free Regsitration Required]
Uploader: Nejind

The actual appearance may be different. Reminder To have a better experience, please upgrade your IE browser. The base station cabinet contains as many as six RF modules.

Core Network Info Community Members: Page 67 When inserting a board into a slot, keep the board on the same plane as the slot.

The installation of cabinets must meet the requirements of the proper design, practical installation, and elegant layout.

Huawei BTSA & BTSL

Connected to the PGND cable. Step 3 Remove the cabinet door to facilitate operations, huswei shown in Figure The customer’s technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. In this scenario, two 80A input power cables are used for upper and lower shelves. The ability to incorporate multiple radio channels in a single base station as well as remote radio units reduces site deployment costs and equipment bt3900l.

  KOJIN KARATANI PDF

Installing The Power Cables In the case of full configuration with 12 RFUs, connect the input power cables and supply the power to the cabinet.

Disconnect the equipotential cable from the lower part of the door. Core Network Info Community Members: By evolution phase, Huawei GSM base stations commonly used on the live network are classified as follows: If the current temperature is out of the range, make protection measures or route the cables again.

GSM Base Stations and Documentation

Installing The Cpri Cable Installing The Monitoring Signal Cables — The optical modules and fiber optic cables are of the multimode type. C cabinet, as shown Figure Installing The Dcdub M12x60 bolts to secure the base, as shown in Figure Before a cabinet is installed, you must familiar with the cabinet structure, application scenario, and space requirements. C Hardware Description — Safety Information During the installation, you must familiar with the following reference document: Figure shows the installation procedure.

Checking Installed Modules And Cables Check whether the power cables are securely connected, and the screws are tightened on the cables in the cabinet by referring to Figure Table Got it, continue to print. If the bubble is not at the center of the level, adjust the cabinet level through the adjusting bolts.

  AIX AU13 PDF

Page Remove the dustproof caps from the optical connectors at the end labeled 1A and 1B on the fiber optic cables, and insert the optical connectors into the optical modules in BBU 1. Compared with 03no information is deleted.

Figure shows the installation process. Return New post Share.

Indoor Macro Base Station BTS — Huawei products

Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. Optional Installing The Modules This site uses cookies. Smart Site Management Systems. Step 5 Use a screwdriver to tighten the screws on the wiring terminals.

Cable clips must be vertical with cables, and the cables in a cable clip must be parallel. Checking Installed Modules And Hhawei